Item Description
Merchandise Description
1) European standard:
a) V-belt pulleys for taper bushings: SPZ, SPA, SPB, SPC up to 10 grooves
b) Adjustable speed V-belt pulleys and variable speed pulleys
c) Flat belt pulleys and conveyor belt pulleys
two) American standard:
a) Sheaves for taper bushings: 3V, 5V, 8V
b) Sheaves for QD bushings: 3V, 5V, 8V
c) Sheaves for split taper bushings: 3V, 5V, 8V
d) Sheaves for 3L, 4L or A, and 5L or B belts: AK, AKH,2AK, 2AKH, BK, BKH,2BK, 2BKH, 3BK
e) Adjustable sheaves: poly V-pulley, multi-pitch H, L, J, K and M
Parts can be made according to drawings and/or samples, OEM service is welcomed.
three) Bore type: pilot bore, finished bore, taper bore, bore for QD bushing.
4) Surface finish: paint, phosphating, zinc plated.
five) Material: cast iron, ductile iron, steel, nylon, aluminum.
six) Made according to drawings and/or samples, OEM inquiries welcomed.
In depth Photos
Solution Parameters
Packaging & Transport
Deal | Normal suitable deal / Pallet or container. Polybag inside of export carton exterior, blister and Tape and reel deal accessible. If buyers have specific demands for the packaging, we will gladly accommodate. |
Shipping |
ten-20working days ofter payment receipt comfirmed (based on genuine quantity). Professional items shipping forward. |
Company Profile
FAQ
Q: Are you company or investing company?
A: We are factory.
Q: How lengthy is your supply time?
A: Typically it is 5-10 days if the items are in stock. or it is fifteen-twenty days if the products are not in inventory, it is in accordance to quantity.
Q: Do you provide samples ? is it free or additional ?
A: Yes, we could supply the sample for free of charge charge but do not pay out the expense of freight.
Q: What is your terms of payment ?
A: Payment=1000USD, 30% T/T in progress ,stability ahead of shippment.
We warmly welcome close friends from domestic and abroad occur to us for company negotiation and cooperation for mutual gain. To supply clients superb top quality merchandise with great cost and punctual delivery time is our responsibility.
US $2.2-9.8 / Piece | |
1 Piece (Min. Order) |
###
Certification: | ISO |
---|---|
Manufacturing Process: | Forging |
Material: | Cast Iron |
Surface Treatment: | Black Oxide, Phosphated |
Application: | Chemical Industry, Grain Transport, Mining Transport, Power Plant |
Diameter: | Standard or Customized |
###
Samples: |
US$ 0/Piece
1 Piece(Min.Order) |
---|
###
Customization: |
Available
|
---|
###
Package | Standard suitable package / Pallet or container. Polybag inside export carton outside, blister and Tape and reel package available. If customers have specific requirements for the packaging, we will gladly accommodate. |
Shipping |
10-20working days ofter payment receipt comfirmed (based on actual quantity). Professional goods shipping forward. |
US $2.2-9.8 / Piece | |
1 Piece (Min. Order) |
###
Certification: | ISO |
---|---|
Manufacturing Process: | Forging |
Material: | Cast Iron |
Surface Treatment: | Black Oxide, Phosphated |
Application: | Chemical Industry, Grain Transport, Mining Transport, Power Plant |
Diameter: | Standard or Customized |
###
Samples: |
US$ 0/Piece
1 Piece(Min.Order) |
---|
###
Customization: |
Available
|
---|
###
Package | Standard suitable package / Pallet or container. Polybag inside export carton outside, blister and Tape and reel package available. If customers have specific requirements for the packaging, we will gladly accommodate. |
Shipping |
10-20working days ofter payment receipt comfirmed (based on actual quantity). Professional goods shipping forward. |
bushing assembly
editor by czh 2022-12-27